Strategy

·

·

M11 OPS team

The first two weeks of a plant audit: what we look at first

Where we spend the first two weeks on a new floor, and why we rarely start with the equipment.

Strategy

·

·

M11 OPS team

The first two weeks of a plant audit: what we look at first

Where we spend the first two weeks on a new floor, and why we rarely start with the equipment.

Engineer inspecting machinery with notes in hand

Where we spend the first two weeks on a new floor, and why we rarely start with the equipment.

Start on the floor

Every engagement begins with observation. We time real cycles across every shift, talk to the people running the line and map where minutes disappear. The data almost always tells a different story from the monthly report.

That first picture sets the baseline every later change is measured against.

Change what matters first

Once losses are sized, the order of work becomes obvious. We tackle the largest, most certain gains first and leave expensive equipment decisions until the process is stable.

Make it stick

Gains hold when the plant team owns the routine that protects them. We build short daily reviews, clear standards and simple visual signals so the improvement survives long after we leave.

Next step

Seeing this on your floor?

These notes come from real lines. Book a floor walk and we will look at yours, with numbers, not opinions.

Engineer inspecting machinery with notes in hand
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000

Create a free website with Framer, the website builder loved by startups, designers and agencies.