Fig. 01 — Clean-room production floor

Pricing & plans

Three plans,

one baseline.

Every plan starts by measuring your lines shift by shift. Pick how far you want us to take it.

Fig. 01 — Clean-room production floor

Pricing & plans

Three plans,

one baseline.

Every plan starts by measuring your lines shift by shift. Pick how far you want us to take it.

Fig. 01 — Clean-room production floor

Pricing & plans

Three plans,

one baseline.

Every plan starts by measuring your lines shift by shift. Pick how far you want us to take it.

01 / Plans

Choose your plan.

Every engagement starts from the same baseline: what your lines produce today, measured shift by shift.

Line drawing of a CNC machining centre

Two weeks

Diagnostic

From $18k

A ranked list of losses on one line, with the value of each fix.

On-site measurement, every shift

Loss tree and OEE baseline

Ranked improvement plan

Line drawing of a roller conveyor with totes

3–9 months

Program

From $120k

We design, buy and commission the fix, then hand the line back at rate.

Everything in Diagnostic

Vendor selection and commissioning

Standard work and training

Line drawing of an industrial robot arm

Ongoing

Embedded team

Monthly retainer

Our engineers join your plant team and run the improvement routine with you.

A lead engineer on site weekly

Monthly scorecard for leadership

Priority access to specialists

02 / Compare plans

What each plan includes.

Every plan builds on the one before it. Nothing is billed by the hour.

Included

Diagnostic

Diagnose

From $18k

From $18k

Most chosen

Most chosen

Program

Program

From $120k

From $120k

Embedded team

Embedded

Retainer

Retainer

Measure

On-site measurement, every shift

Lines covered

1 line

Up to 3

All lines

OEE baseline and loss tree

Ranked plan with the value of each fix

Deliver

Business case for every project

Vendor selection with neutral bids

Commissioning to rate

Standard work and operator training

Results target written into the contract

Sustain

Engineer on site

2 weeks

3–9 months

Ongoing

Monthly leadership scorecard

Priority access to specialists

03 / Every plan

What you always get.

A named lead

One senior engineer owns your result from the first walk to hand-over.

Numbers first

Every recommendation carries its value in OEE points, hours or dollars.

Your team trained

Floor leads run the new routine before we step back.

Neutral advice

We are not paid by equipment vendors. Bids are compared on the same basis.

04 / Questions

Before you book.

Still unsure which one fits? An engineer can tell you in a 30-minute call.

Yes. Most clients start with a diagnostic on their most constrained line.

No. We help you choose and commission it, and vendors bid on the same specification.

Usually within three weeks of signing.

Each program has a target in the contract and a review if we miss it.

Next step

Not sure where to start?

Send us the line that worries you most. An engineer replies within one business day with the engagement we would suggest.

Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000

Create a free website with Framer, the website builder loved by startups, designers and agencies.