M11
Menu
Fig. 05 — Clean-room assembly floor
Projects
Case studies from plants we have audited, automated and brought up to rate. Every figure is tracked by the client’s own team.
Start a project
Our services
Case studies
(06)
Case study
2026
·
Automotive
−38%
Ramp-up time vs. plan
Ramp-up
16 wk
→
10 wk
Scrap rate
4.1%
1.6%
Read case study
Aerospace
+27%
Spindle utilisation
Utilisation
51%
65%
Setup time
95 min
40 min
2025
Logistics
2.1×
Peak throughput
Orders / hour
1.8k
3.8k
Mis-sorts
1.2%
0.3%
Electronics
−31%
Material travel distance
Travel / unit
420 m
290 m
Lead time
6.5 d
4.2 d
Food & beverage
−45%
Manual handling hours
Handling hours
220 h
121 h
Line stops
34 / wk
12 / wk
2024
Medical devices
+12 pts
OEE across both plants
OEE
61%
73%
Paper records
100%
8%
Create a free website with Framer, the website builder loved by startups, designers and agencies.