Distribution centre conveyors

Conveyor retrofit and sortation logic for a peak-season distribution centre.

Headline result

2.1×

Peak throughput

Result

Before

After

Change

Orders / hour

1.8k

3.8k

+111%

Mis-sorts

1.2%

0.3%

−75%

Totes moving on a roller conveyor in a distribution centre

Sector

Logistics

Location

Laval, QC

Year

2025

The challenge

A regional distribution centre could not ship its peak-season volume. The conveyor loop jammed at the sorter merge, and mis-sorted totes were sent back by hand.

What we did

We modelled the flow with a year of real order data, added accumulation buffers before the merge and rewrote the sortation logic so totes are released in waves.

The retrofit went in over three weekends, without losing a shipping day.

The result

Peak throughput went from 1,800 to 3,800 orders an hour in the same building, and mis-sorts fell from 1.2% to 0.3%.

Next step

Have a line that should be doing better?

Tell us what is slowing it down. An engineer replies within one business day with a first read on where the time is going.

Totes moving on a roller conveyor in a distribution centre
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000

Create a free website with Framer, the website builder loved by startups, designers and agencies.