Service

03

Sheet

M11-SVC-

03

Automation & robotics

Cell design, vendor selection and integration of robots, conveyors and vision.

On your floor today

Automation projects bought on a vendor’s demo

Cells that never reach the rate in the proposal

Operators left out until the week of start-up

What we do

Automation roadmap

Cell design

Vendor selection

Commissioning

What you keep

Cell concept

Layout, takt and capacity model.

Vendor scorecard

Bids compared on the same basis.

Ramp-up plan

Training, spares and acceptance criteria.

We decide what to automate before deciding how. Then we design the cell, run the vendor process and stay through commissioning until the cell hits rate.

Six-axis robot arm loading parts into a test rack in a clean room

From first walk-through to a line that holds its numbers

Automation roadmap

Which tasks to automate, in which order, and why.

Cell design

Layout, cycle time and safety, simulated before purchase.

Vendor selection

A neutral tender process with comparable bids.

Commissioning

On site until the cell runs at rate with your team.

Deliverables your team keeps using after we leave

Cell conceptDrawing
M11-SVC-03Rev A

Cell concept

Layout, takt and capacity model.

Vendor scorecardScorecard
M11-SVC-03Rev A

Vendor scorecard

Bids compared on the same basis.

Ramp-up planPlan
M11-SVC-03Rev A

Ramp-up plan

Training, spares and acceptance criteria.

Process

Here
at every
step

Changing how a plant runs can seem like an insurmountable task for operations leaders, engineers, owners and their teams.

01DiagnoseNow
Two weeks on your floor. Every loss is timed, ranked and given a value before anything changes.±0.40 mm · OEE baseline 61%
02Engineer
Layouts, specs and tooling built around your real constraints, signed off by the people who run the line.±0.12 mm · Changeover 50 → 18 min
03Integrate
Vendors, integrators and your team on one schedule. Start-up milestones tracked weekly, not monthly.±0.05 mm · Start-up on schedule
04Scale
Standard work, training and a review routine your floor leads own, so the gains hold at full rate.±0.02 mm · OEE held at 75%
01020304

Next service

Industry 4.0 & data

Sensors, MES and dashboards that turn machine data into daily decisions.

→

All services

Next step

Ready to fix this on your line?

Tell us what is slowing it down. An engineer replies within one business day with a first read on where the time goes.

Six-axis robot arm loading parts into a test rack in a clean room
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000

Create a free website with Framer, the website builder loved by startups, designers and agencies.