Service
02
Sheet
M11-SVC-
02
Plant performance audits
Line-by-line diagnostics of OEE, bottlenecks, scrap and changeover time.
On your floor today
OEE is reported but nobody trusts the number
Scrap and rework are absorbed instead of tracked
Changeovers keep growing as the product mix widens
What we do
Time studies
Loss tree
Bottleneck analysis
Quick wins
What you keep
Audit report
Findings ranked by value, with evidence.
Loss tree model
A living model of your plant’s losses.
30-day plan
Actions, owners and expected gains.
In two weeks on your floor, we find where time and margin leak, and size every loss so you know which ones are worth fixing first.

From first walk-through to a line that holds its numbers
Time studies
Direct observation of every shift, not just the day shift.
Loss tree
Every minute lost, classified and costed.
Bottleneck analysis
Where capacity is really constrained, and why.
Quick wins
Fixes your team can apply within 30 days.
Deliverables your team keeps using after we leave
Audit report
Findings ranked by value, with evidence.
Loss tree model
A living model of your plant’s losses.
30-day plan
Actions, owners and expected gains.
Process
Here
at every
step
Changing how a plant runs can seem like an insurmountable task for operations leaders, engineers, owners and their teams.
Next service
Automation & robotics
Cell design, vendor selection and integration of robots, conveyors and vision.
→
All services
Next step
Ready to fix this on your line?
Tell us what is slowing it down. An engineer replies within one business day with a first read on where the time goes.
