Clean-room assembly floor

Layout and flow redesign of a clean-room assembly floor during expansion.

Headline result

−31%

Material travel distance

Result

Before

After

Change

Travel / unit

420 m

290 m

−31%

Lead time

6.5 d

4.2 d

−35%

Technicians working in a clean-room assembly hall

Sector

Electronics

Location

Drummondville, QC

Year

2025

The challenge

An electronics assembler was expanding into a second clean-room hall. The original layout had grown one machine at a time, and each board travelled 420 metres between process steps.

What we did

We mapped the full value stream with the production team, then designed the new hall around the product’s path instead of machine types.

Kitting moved next to the line, and test stations moved beside final assembly.

The result

Travel per unit fell to 290 metres and lead time from 6.5 to 4.2 days, while the plant added capacity in the new hall.

Next step

Have a line that should be doing better?

Tell us what is slowing it down. An engineer replies within one business day with a first read on where the time is going.

Technicians working in a clean-room assembly hall
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000
Operations strategy for manufacturers
Power onOK
Conveyors at speedOK
Quality gatePass
Shift A · 06:00Ready
000

Create a free website with Framer, the website builder loved by startups, designers and agencies.